Significant progress being made on Beta-1 project

UCOR’s deactivation and demolition (D&D) teams are making substantial progress at the former 210,000-square-foot Beta-1 uranium enrichment facility at the Y-12 National Security Complex. Following deactivation, the current focus is to fill the basement with controlled low-strength material (CLSM)—a concrete mixture— to stabilize the foundation for demolition equipment, with completion anticipated in May. A significant…

ORNL Nuclear Operations responds to inclement weather

A small but mighty ORNL Nuclear Operations crew responded to the cold and snow over the last two weekends. They conducted the following activities at Liquid and Gaseous Waste Operations facilities and Surveillance and Maintenance facilities across ORNL. Snow clearing: Removal of accumulated snow from access roads, parking lots, walkways, and operational routes to maintain…

Trees removed from Outfall 724 area at Heritage Center

A significant amount of vegetation and trees were recently removed at the Heritage Center surrounding Outfall 724 and the adjunct 770 embayment. The work was performed by AISI-CTI JV, a joint venture subcontract between AIS Infrastructure and CTI and Associates, Inc. AISI-CTI JV was originally onboarded for tree removal at the Environmental Management Disposal Facility;…

UCOR Landfill Operations gets landfills back up and running

After a forecast of significant snow and ice this past weekend, UCOR’s Landfill Operations initiated its winter storm recovery plan to get landfill operations on the Oak Ridge Reservation (ORR) back up and running. Prior to the storm, Landfill Operations implemented various recovery plan efforts to minimize damage, including covering selected waste on the sites,…

ETTP Heritage Center project set to remove Outfall 724

Workers have completed mobilization for a significant new project at the ETTP Heritage Center aimed at removing Outfall 724, which had been operating under a National Pollutant Discharge Elimination System (NPDES) permit. An NPDES permit is a regulatory requirement for facilities that discharge pollutants directly from point sources into the state’s surface waters. To remove…

Waste Operations water warriors take action during rainfall event

PAhead of a forecasted 4.5 inches of rain over this past weekend, UCOR’s Waste Operations teams at ORRL and EMWMF took proactive measures to efficiently ensure safe and compliant water management at onsite landfills, critical to continuing waste disposal operations at the Oak Ridge Reservation. reparations focused on landfill wastewater, comprised of leachate and contact water, that must…

Remote-operated excavator being used to deactivate hot cell

To keep crews safely away from radiation, UCOR has started using the Brokk remotely operated excavator to deactivate the remaining portion of the final hot cell inside ORNL’s former Radioisotope Development Laboratory (Building 3026). This and the five other hot cells that were previously removed from the building were heavily shielded concrete rooms that protected…