ORNL Nuclear Operations crews are repairing corrosion inside vessels at the Process Waste Treatment Complex, known as Building 3608. To make these repairs, workers are removing filter media, which is a combination of sand, anthracite, and gravel, that extract solids from the waste stream. Wastewater goes through the filter media so additional treatment methods can more efficiently remove radioactive contamination.
To access areas inside the vessels to make the necessary repairs, the filter media has to be removed. This removal is achieved by using high-powered vacuums, pumps, and manual removal. Four vessels will undergo filter media removal as part of an ongoing effort to investigate the internal condition of the vessels and determine an appropriate, permanent repair. Completion of the filter media removal takes a full crew of chemical operators, radiological controls personnel, and maintenance staff approximately two weeks.
The team has successfully removed the filter media in the first vessel and is now conducting repairs, sandblasting, and coating with a primer and epoxy system before reassembling diffusers and replacing carbon steel hardware with stainless steel. Under normal operations, 3608 uses two pairs of vessels to pretreat wastewater. However, during the media removal and repair process, the facility reduces waste flow rates as it is functioning with one less vessel online.
“Because of these limitations, the media removal process and any repair work must be carefully coordinated and diligently executed to avoid interfering with operations,” said ORNL Nuclear Area Project Manager James Wheeler.
Additional corrective maintenance, preventative maintenance, and routine operational tasks are restricted due to the increased resources needed to complete this task.
Thanks to the group’s coordination and teamwork, ORNL Nuclear Operations continues to receive and process waste without disruption.